Activate services by QR code
Boat owners scan the code on the selected outlet to open the Emiko Customer App and follow the configured activation and payment flow.
Green Harbor Technology · Supply pedestals
Smart power and water for your marina.
Self-service electricity and optional water for boat owners. Meter consumption, manage access and handle configured payments through the Emiko platform.

Designed around daily use
QR access at the outlet, clear consumption records and one platform to manage your connected service points.

Boat owners scan the code on the selected outlet to open the Emiko Customer App and follow the configured activation and payment flow.
Each controlled power outlet has a MID-approved electricity meter. Compatible water configurations also record consumption for reporting and billing.
Offer card and MobilePay payments through the Emiko Customer App and your configured payment agreement. No payment terminal is required on the pedestal.
The pedestal connects directly to the Emiko platform over GSM. Operators can view status and consumption without an RF mesh between pedestals or a central site controller.
Plug detection switches the outlet off when the customer disconnects, helping prevent an outlet from remaining active after use.
The local controller continues the configured service and stores consumption records during a connection interruption. Records synchronize when connectivity returns.
The freestanding pedestal is available in AISI 316 stainless steel, with SS304 and marine finishes documented as configuration options. Confirm the enclosure specification for the selected model.
Outlet, water, lighting and control components are selected per installation. Service access and retrofit options allow individual components to be replaced without changing the complete pedestal.
For boat owners
From the QR code on the outlet to automatic switch-off when the boat owner disconnects.
Follow the on-screen activation and payment instructions in the Emiko Customer App.
Electricity use is recorded automatically and available in the app.
Removing the plug switches the outlet off automatically.
Connected through the Emiko platform
Your site. Your configuration.
Use a freestanding pedestal for a new service point, a WallBox where a wall or post is available, or an Installation Kit to upgrade compatible equipment.

Freestanding power and water pedestal for marina, campsite and service-area installations. Documented models provide 2 to 8 CEE outlets in 230 V and 400 V combinations.

Wall or post-mounted enclosure using the Marinella control principle where a freestanding stainless steel pedestal is not required. Outlet options must be confirmed for the WallBox format.

A retrofit component kit for a compatible existing pedestal, documented as Constructum. Add communication, controlled CEE outlets and MID-approved electricity metering while retaining suitable cabinet and protection components.
Already have pedestals?
An existing pedestal can remain useful even when its control and billing system needs an update.
The Constructum retrofit kit adds Emiko control to a compatible existing pedestal. The documented kit includes the controller, communication hardware and the metering and switching components required per controlled outlet. The enclosure, protection devices and wiring are assessed before reuse.
Technical details
Compare the published options, then confirm the combination for your chosen model.
Overall dimensions, weight, IP and IK ratings, exact water flow and price are not published as universal values. They must be confirmed for the quoted model.
Ask about a specification| Specification | Published options |
|---|---|
| Power outlets | 2 to 8, depending on model |
| CEE voltage | 230 V single phase and 400 V three phase |
| Current ratings | 16 A, 32 A and 63 A model configurations |
| EV charging | Type 2, 11 kW or 22 kW options |
| Water | Optional 1 x 1/2 inch tap on compatible models |
| Electricity metering | MID-approved meter per controlled outlet |
| Activation | QR Scan and Go through the Emiko Customer App |
| Connectivity | Direct GSM connection to Emiko, with local offline operation |
| Materials | AISI 316 stainless steel; SS304 and marine finishes available by configuration |
Planning
Start with the services your marina needs. We help confirm the configuration for each location.
Record the required number of outlets, voltage, current, water service and any EV charging point at each location. The published range covers 2 to 8 CEE outlets, but the available combination depends on the selected supply and model.
Use a new freestanding or wall-mounted unit where the existing enclosure is unsuitable. Where the cabinet, protection and wiring can be retained, the Constructum kit can add metering, switching and Emiko communication without replacing the complete pedestal.
Dimensions, weight, IP and IK ratings, water flow and price are not universal published values. They belong in the project quotation for the selected configuration.
Gallery
Illustrative views of the pedestal, installation formats and matching series products.





Good to know
Practical answers for choosing, using and upgrading your service pedestals.
Marinella NEO is a connected power and water pedestal for marinas and related sites. It combines local outlet control, MID-approved electricity metering, QR activation and communication with the Emiko platform.
The documented freestanding range covers 2 to 8 CEE outlets, depending on the selected supply and model. Options include 230 V and 400 V outlets at 16 A, 32 A and 63 A. Confirm the exact combination in the project specification.
The local controller continues the configured service and stores consumption records during a network interruption. Records synchronize with Emiko when the connection returns.
The connected pedestal uses a direct GSM connection to the Emiko platform, so no RF mesh or central site controller is required. Customers follow the configured online payment flow, without a payment terminal or physical access card at the pedestal.
The NEO Installation Kit can add Emiko control, MID-approved electricity metering and controlled CEE outlets to a compatible existing pedestal. The cabinet, electrical protection and wiring are assessed before reuse, and the payment workflow is configured for your installation.
Marinella Basic provides manual service activation without metering or digital billing. Marinella NEO adds digital activation, electricity metering and management through the Emiko platform, with water metering on compatible configurations.
The customer scans the QR code for the selected outlet and completes the configured online flow in the Emiko Customer App. Card and MobilePay processing depend on the operator's payment agreement. No payment terminal is required on the pedestal.
The published material options include AISI 316 stainless steel, SS304 and marine finishes. A universal IP or IK rating is not published for the complete range, so the enclosure and environmental specification must be confirmed for the selected model.
Marinella NEO provides controlled power and optional water. Marinella NEO Light adds walkway lighting, while LightBin combines lighting and waste collection. The freestanding products share a coordinated stainless steel design.
Use the freestanding stand for a new marina service point, with optional water on compatible models. WallBox provides metered power where wall mounting suits the site. The Constructum retrofit kit upgrades a compatible existing pedestal after its enclosure, protection and wiring have been assessed. For several vessels sharing a canopy style service point, compare MarinePro.
Have a question about your project?
Talk to our teamLet’s talk about your project
Tell us about the site, the services required at each location and the equipment already in place. We will help select the format, outlet configuration and operating setup.
Tinnetvej 70, 7173 Vonge, Denmark