350 A shore power for larger vessels in Akranes
Two Marineium pedestals with our new 350 A module are now in service at Faxaflóahafnir in Akranes. They supply up to 350 A at 50 Hz, with remote control and energy monitoring in the EMIKO Platform.
Objectives
- Supply larger vessels with more power at berth
- Keep the 350 A outlet in the pedestal, next to the other outlets
- Operate it in the EMIKO Platform like the rest of the harbor
- Make 350 A a standard option for EMIKO-connected pedestals
The challenge
More power at berth
As ships need more power at berth, ports need shore power connections that can meet that demand.
- Larger vessels need more power than the standard outlets on a pedestal supply.
- Faxaflóahafnir already runs its Marineium pedestals in Reykjavík through EMIKO.
- The new connection had to be operated the same way as the outlets the crews already use.
The solution
A 350 A module inside the Marineium pedestal
Vikingegaarden developed a 350 A module for its power pedestals and delivered two Marineium pedestals with the module to Akranes.
- Up to 350 A at 50 Hz
- Outlet with a built-in pilot signal
- 30 × 30 cm stainless steel enclosure next to the pedestal's other electrical modules
- Remote control of the outlet in the EMIKO Platform
- Energy monitoring, as with the pedestal's other outlets
The results
- Two Marineium pedestals with the 350 A module in service in Akranes
- The crew connects the vessel's shore power cable and the outlet is switched in EMIKO
- Electricity use is tracked like the other outlets on the pedestal
- 350 A shore power is now a standard option for EMIKO-connected pedestals
Deployed in this project
Products behind the story
Project record
Related project reports
26 Marineium stands across three harbor areas
Faxaflóahafnir ordered Marineium power pedestals with Emiko integration for the modernization of the Old Harbor in Reykjavík.
Read the report →From manual utility control to full self-service
One of Iceland's key harbors moved from fully manual utility control to a self-service digital system powered by Vikingegaarden equipment and the Emiko platform.
Read the case study →Planning shore power for larger vessels?