Complete solution · AtoN House Nordic

Offshore construction marks

Offshore construction marking provides the marine and aviation signals specified for each phase of the works.

A representative scene for this solution, seen from a distance: Offshore construction marks
The settingMarking for offshore works and wind farms
ON THE SITETHE PLATFORMASHORE, FOR THE OPERATORBuoy lanternMCL360 VIA NAVIGUARDStructure lightNOVA-65 VIA NAVIGUARDPowerGuardEXTERNAL LOAD SUPPLYStatusSUPPORTED EQUIPMENTAlarmsCONFIGURED NOTIFICATIONSPower dataAVAILABLE MEASUREMENTSRemote settingsRELEASED PROFILES ONLYEMIKOSPECIFIED LINKSSTATUS AND ALARMSMODEL FUNCTIONSON THE SITEBuoy lanternMCL360 VIA NAVIGUARDStructure lightNOVA-65 VIA NAVIGUARDPowerGuardEXTERNAL LOAD SUPPLYEMIKOSPECIFIED LINKSSTATUS AND ALARMSMODEL FUNCTIONSASHORE, FOR THE OPERATORStatusSUPPORTED EQUIPMENTAlarmsCONFIGURED NOTIFICATIONSPower dataAVAILABLE MEASUREMENTSRemote settingsRELEASED PROFILES ONLY

Commissioning verifies the status, alarms and controls supported by each connected instrument.

The components

Equipment
and interfaces

6 components with specified functions.
The labels identify their Emiko integration.

How it works

From the plan to the
commissioned installation

The marking programme follows the construction phases. Each change is documented and checked before handover.

  1. 01

    Define phases

    The marking programme records the authority requirements, work phases, positions and operating periods.

  2. 02

    Deploy marks

    Specify moorings, structure brackets, cable protection and power for all loads; deploy and check the initial buoy marks.

  3. 03

    Equip structures

    Fit Nova-65 marine lights and required aviation lights; commission each phase before the work area changes.

  4. 04

    Install permanent marks

    Install and test the final marks before withdrawing temporary equipment; verify any separately specified racon or AIS.

  5. 05

    Verify handover

    Handover records each mark, its service responsibility and the monitoring functions verified in Emiko.

Where it is used

Offshore works requiring phased marking

Wind farm developers, marine contractors and port operators managing offshore construction, dredging or cable works.

  • 01

    A wind farm during foundation and turbine installation

  • 02

    A dredging or reclamation work area

  • 03

    A cable installation corridor with temporary marking

Planning

Delivery scope
and equipment options

Delivered by Vikingegaarden

  • Equipment specification from the marking plan, site data and operating requirements
  • Component supply with the agreed manufacturer documentation
  • Installation and commissioning, or technical support for the appointed contractor
  • Emiko configuration and acceptance checks for supported equipment interfaces
  • Service scope, inspection requirements and spare parts confirmed in the quotation

Options for this solution

  • HEKLEO 2 XS racon on a structure with assessed mounting and external power
  • NaviSuite Perio virtual AIS service with authority-approved positions and shore coverage
  • Cumulus weather station on a suitable fixed structure

Good to know

Before the
quotation

How is temporary equipment supplied?

The quotation defines equipment quantities, deployment duration, servicing and recovery. Rental or return arrangements and availability are confirmed on request.

How are virtual mark positions changed?

The optional NaviSuite Perio system manages mark positions and activation through a separately specified shore transmitter. Authority approval, AIS identities, coverage and reception on compatible displays are required. No Emiko connection is included.

What is required for a quotation?

The enquiry requires the construction programme, site coordinates, marking requirements, structure drawings and water depths. Available supplies, deployment access, monitoring and service responsibilities should be stated.

Plan this solution

Project quotation

The specification defines the equipment, installation scope and price.

The enquiry requires a chart, positions, marking requirements, mounting details, available power and required autonomy.

Contact Vikingegaarden

Plan this solution

Offshore construction marks

The chart or a sketch of the site, the positions and ranges required, and the power available are enough to start.

Your contact details and the site

Contact details are used to respond to the enquiry. Privacy policy

Telephone and email +45 7580 3960
sales@vikingegaarden.com